testing and simulation

The control system production line testing is an integral part of every solution delivery. In special environments (like nuclear and chemical industries) a more rigorous testing based on the complete production line simulation is necessary. On the other hand in the food industry on site testing may require very short production line shutdowns or disturbances.

img-test

from our realizations

Production line APV3 modernization - Danone Benešov (2011)

Example of a deployment of the complete SW Wonderware software stack (Wonderware application server, Wonderware historian server, Wonderware information server, InTouch). Production line control is implemented using PLC Telemechanique.

Control of polybutadien production - Synthos Kralupy (2010-2011)

So far the biggest project we’ve implemented. A complete production line control in the petrochemical industry. The project duration was 15 months (from receiving the project documentation till commissioning). It included several weeks of FAT tests and SATA tests with the customer, project architects and the license owner of the production line technology.

Control system for GEMS radiation monitoring system

Control system for a radiation monitoring soluiton for the nuclear energy industry in the UK. The system was delivered towards strict development methodology requirements aligned with the nuclear industry standards.

strategic partner

software partners

Have you any question or are you interested in our offer?

Please use the form below or call +420 606 957 691, +420 774 112 848